Demo

    Punjab Newsline, Shimla, March, 20-

    In a significant step towards ensuring smooth connectivity in the ladakh region, the snow clearance operations on National Highway-3 Have Been Commented Under The Leadership of Prost Himank. The operation aims to restore connectivity along

    The Ongoing Operation is Being Carried Out in Extreme Weather Conditions, with Teams of Skilled Personnel and Heavy Machinery Deployed to clear Massive Snow Accumutions Along Keey Stretches of the High. National Highway-03, which connects manali to leh, remain vital for transport and logistics, especially for the armed forces stationed in the high-altitude is of LADAKH. Due to Extensive Winter Snowfall, The Highway Remains Inaccessible for Several Months, Necessitating Extenting Exforts to Restore the Connectivity Ahead of the summer season.

    The snow clearance teams of 111 rcc/753 brtf are working relatively in sub-zero temperature, Tackling Snow Drifts Ranging Between 10 to 15 Feet at Multiple Locations Locations Locations. The operation is particularly challenging Near High Altitude Tanglang La Pass (17500 Ft), which witnesses extreme snowfall and frequent avalanches.

    Share.

    Leave A Reply